Monday, February 19, 2018

Kitchen: Design Plan; Before and Progress

Okay, so we still live here in this two-bedroom townhouse.  The more the kids grow, the smaller the place feels.  Also, kids are hard on stuff.  So my to-do list has grown, but very little has been completed.  We still have yet to replace any floors & the bathrooms both have trim & finishing touches yet to finish.  

About a year ago, I decided to repaint pretty much the entire place one color - an updated color ~ Chicago Fog from Behr.  A few weeks ago, I decided to finally do the kitchen.  We were SUPER sick of the yellow (not-so-subtle squash).  
For some reason (cabin fever?), I decided to start painting out the kitchen cabinets, which I knew would be/will be a ton of work.  To test the process, we started with the pantry.  White cabinets, new pulls and the same old, cleaned-up hinges.
 First step was to take the doors off, sand them all down, clean the hinges (and mark them, which I'll note later).  This was where I made my first mistake - the wrong primer.  Yellowish tint kept showing through due in part to the prior owner being a heavy smoker.  So, I did 3 coats of primer in 2 weeks.
Then I learned that only oil-based primer will block stains.  The man at Home Depot's paint department said one coat of primer should do, but he also recommended two coats of the Behr Marquee with primer and paint in one.
After another coat of oil-based primer on the trim and doors, I was finally ready for color of our choice, "Frost," which I let my daughter & husband pick :)
Once each door was painted, I was anxious to get the hinges back on and hoped they would easily be re-attached.  This was a helpful hint I'd read about (on a blog or diy site).  Before painting, I'd marked under the hinge 1-4 (four doors) and marked the inside of the hinge so the same ones went back on their original door.  You can't see the number once the doors are hung.

I LOVE the clean, cottage look!


But am not looking forward to finishing the rest of kitchen.  Once we do, we'll plan to replace the counter-top with a clean light laminate.  Subway tile backsplash, updated light fixtures, new sink & faucet.  That's all on the longer-range to-do list.  Like I said, it's ever growing.  Stay tuned for updates...

Sunday, August 7, 2016

Little Things Make a Difference

Hello again.  It has been awhile.  I'm refining my list and making a few plans for finishing rooms that have been left trimless for many months now.  In the meantime, I finally redid an old chest of drawers.  It'll help with staging the room (when we go to sell), so I'm counting it.


 It started as nearly raw wood.  So I just sanded and cleaned the top; removed old handles; painted with one good coat of Behr paint & primer in-one.  The color, which I love, is "skinny jeans." Finished with new pulls and done.

Sunday, September 27, 2015

Entryway: Half way there

The first half of the entryway stairs are done!
Carpet is gone.  Stairs are clean.  Staples removed (finally) and stain applied.

Turns out, staining is quite a lot different than painting. I pretty much wiped it on with an old sock and wiped it off with another one.  Trying to get the right balance of covered but not soaked.  I stained the trim next the stairs trying to follow the wood grain, but the angle was awkward.  

Now, with the stairs looking so fresh, I'll need to repaint the wall to finish the clean look.  Obviously, we also still have to do the second half of the stairs (landing down to the garage).  Curious to see what those stairs look like.  We're really hoping they're in as good of shape as the first set.

Tuesday, September 22, 2015

Entry way: Design Plan

Was this on my list?  Whether or not I included it on my assessment post (I did.  Just checked...number 6:), getting rid of the carpet on our split-level entry way stairs is on our list.  Here's the design plan:

We will remove the way-too-worn carpet, and stain the stairs and rises a dark maple color.  Originally, I thought about white rises, but - though I love that look - not in our place.  We have dark trim and baseboards throughout most of the house and I want to match the stain to the trim that's already there.  Also, our stairs have been covered with carpet for decades and there is some (though happily very minimal) discoloration in the wood that needs to be hidden.  So, dark maple it is.

Replacing the iron railing is not a priority.  It's one of the "nice-to-haves" that we could consider after the stairs are refinished.  But our dated railings are in pretty good shape, so I just don't want to spend much effort there.  If we do replace them, the design goal would be a combination of wood and iron.

Progress is being made.  On the first set of stairs (from the landing up), we've removed the carpet; pulled out most of the carpet and padding staples; cleaned the wood with baking soda and water; and tested our stain of choice...

 I think we're going to love it!

Wednesday, June 17, 2015

Stalling

Progress on the house has stalled a bit while other things have taken priority - kid stuff, family stuff, fun stuff - summer! But last Saturday was rainy (and we've started buying in bulk:), so I redid the hall closet. It needed updating and cleaning. We're always looking for ways to make the most of our small spaces:
We cleaned, painted, organized and installed three shelves. 
All of which we already had on hand.
This guy was asleep the whole time:)

Sunday, April 19, 2015

Assessment

We've made quite a bit of progress around here, though we still have several things to do in order to call either of the rooms "finished."  Maybe we'll never be completely done with this place, but here's the work I know we have yet to do:

In the upstairs bathroom
  • install white bi-fold closet door  changed my mind - leaving it open 9/22/15
  • replace light fixture (I'm considering strapping the texture off the ceiling, too, which would require I repaint) updated 9/22/15
  • install baseboard
  • touch-up paint jobs 
  • replace flooring (this one won't get done until we decide on what we're doing with the flooring in the entire upstairs.)
  • Two optional jobs - replace the sink and tub faucets - I'm not all that interested in learning do-it-yourself plumbing work
In the downstairs bathroom
  • install baseboard 
  • replace light fixture
  • Optional job - replace sink faucet
So, we're getting close.  But I've added a few more jobs to the overall plan to prep this house for resale:
  1. Repaint upstairs living area and kitchen. Complete 2/19/18
  2. Install black pulls on the kitchen cabinets Progress 2/19/18
  3. replace kitchen light fixture and scrape the texture from the ceiling
  4. I'd like to do a backsplash, but likely this won't happen
  5. Replace flooring in the upstairs
  6. Remodel Refinish the entryway stairs and replace the handrails  underway! 9/22/15 
    1. Still need to varnish.  
So, the list continues to grow and time is running low.  We now have less than a year before we plan to put the place on the market.  Funny thing is, though, the closer we get to a big move, the less I want to go and the more I think we can just keep making this place work for us.  (Of course in reality, I don't want to share a room with our baby forever.)

But this townhouse has been good to us.  We have good neighbors.  We have the freedom to make it our own, but it gives us such a low maintenance lifestyle - no snow removal in the winter, no mowing in the summer.  In a lot of ways, it feels like this little place has allowed us a small piece of a simpler life.  
  

Saturday, March 7, 2015

Downstairs Bath: Deconstruction

While my three kids napped this afternoon, I attempted to remove that hideous, dated, impossible to fully clean shower door from the downstairs bathroom.  Turns out, like so many things, it wasn't nearly as difficult as I'd feared.

Each door was screwed on with four screws and glued or caulked together.  So first thing was to expose the screws.  I just took a hammer and a flat-head screwdriver and started pulling the thing apart.  Pulled the screws out.  Used a box cutter to cut through the caulk and then my muscle (what?) to pull the left door off and then the right.
I used Goo Gone (which smells terrible but works wonders on a a number of messes around the house) to loosen the remaining caulk and scrape it away.  I used this white silicone to fill the wholes left by the screws and after it dried, I just went over all of it with fine sandpaper.
It made quite a mess, but I love the cleaner-than-ever result.
Looks better already!
Then we added a tension shower rod, cute-as-a-button shower hooks & this shower curtain 
that I already had from Ikea.
Two new memory foam bath rugs, too, from Target.
The Before and After
I'm so happy that this one is done.  I've wanted to remove those doors since we moved in (nearly 6 years ago!), but was too intimidated.  For some reason, that kind of demo seemed a much bigger deal than it turned out to be.  The entire project took about two hours.