Saturday, September 13, 2014

Interlude

My progress on the upstairs bathroom has slowed a bit. The next big project will (hopefully) happen with my dad's help in a few weeks. In the meantime, I thought I'd tackle a quick update: the towel hooks. The materials: a 3" pre-cut oak board and six oil rubbed bronze hooks. The painting, sanding and prep was easy. The installation was not. At first I couldn't find the studs to mount the board onto wall and then I kept stripping the screws trying to install the hooks. So, we'll be headed back to the hardware store in the morning to see if we can salvage the project. I hope so cos it's so close and I really want to like it.


Another quick project today was my first furniture redux. I'd been wanting to try it out since the spring. The piece was an eight-year-old coffee table from Walmart that was given to us years ago. My daughter picked the sunny shade of yellow and we're trying the chalkboard paint on top. The paint job combined with tightening all the joints made this look and feel like a brand new table. It's a perfect fun little update for our downstairs family room/playroom.



Saturday, August 2, 2014

Upstairs Bathroom: Linen Closet

This weekend I redid the linen closet in the upstairs bathroom.  Since we moved in, I hadn't done anything with the closet but wipe it clean and replace the doorknob.  Earlier this summer, when I was building the kids' a cedar sandbox, I remembered how I love the earthy smell of cedar.  It gave me the idea to replace these nasty old shelves with fresh, clean cedar planks.  We also plan to replace the closet doors with white ones and then I'll put my personally-selected Anthropologie doorknob back up.
First step was to take off the old doors and remove the grimy old hardware.
Out with the old!
Next, I painted the closet ultimate white.  We've been using Dutch Boy's Refresh paint all over this house.  The closet had never been painted by me and probably not by the guy who owned this place before us, either.  It needed it.  And it's nice what a simple coat (or three) of clean white paint can do.

My husband helped me plan today's trip to the lumber section of the hardware store.  It was a first for me.  I called Menards to find out what cedar boards they had in stock and, at the suggestion of Dad, I called Home Depot, too.  Turns out Home Depot had a better selection and had 1" x 4" x 12' boards, instead of just the 8' boards Menards had.  Longer boards meant we could get more cuts per board and less wasted wood.  Also, here's something Dad and the guys at the hardware store already knew ~ a 1" x 4" is really a 3/4" x 3.5" board.  Well, good to know, cos that makes a difference when you're measuring and planning the shelf spacing.

I talked to Dad about how I should fasten the planks to the wall.  Did I need screws or nails or wood glue?  He said, instead of fastening each board to the wall, I should attach a board down the middle to hold them all in place and then I can just slide the shelves in (and they can be easily taken out again for cleaning or painting).  Brilliant!  I would not have thought of that.  Following Dad's advice, we ended up with 20 planks cut to 30 1/4 inches for the shelves and 4 shorter planks to fasten underneath.  We also ended up with no wasted wood.  The nice young guy, Kai, at Home Depot cut down five 12-foot boards and gave us a discount on the ones that cracked, even though they were still very usable.  We bought a package of 1 1/4 wood screws ~ again with the advice of my dad ~ the narrowest we could find so we wouldn't split the boards and, less than $35 later, we were set.

I built the first shelf in about twenty minutes - just eye-balled the spacing, drilled two holes per plank and screwed the boards together.  I installed each shelf as I got them put together and loved watching the progress.
Yes, replacing the floor is part of the plan.
We are so pleased with the result.  It feels spa-like to me and smells fresh and woodsy.
 Exactly what we were going for.
 We'll leave the closet (and all it's contents) exposed until we have time to figure out how to buy and install new folding doors.  Until then, we'll enjoy the progress we've made so far.

Thursday, July 24, 2014

Upstairs Bathroom: Before

Work is underway! So, before I get too far along, I'd better capture where we started.  Here are the befores:
Vanity
Linen Closet
 The Loo
Doorway
Add now for the teaser (just to keep you wanting more:)...
Stay tuned for progress reports!

Saturday, July 19, 2014

Upstairs Bathroom: Design Plan

Okay. It's time to get started! Let's start with my vision.  This is a 5 x 10 foot, three-piece bathroom with a decent-sized linen closet and poor lighting. We're going for a calm, clean & cottagey feel - so lots of whites, creams and tans. We made our first trip to Menards this morning for paint, hareware and inspiration. Any step towards progress makes me so happy. And the fact that my husband is interested in helping with this project makes it even better. I can't wait to get to work!

Pay no attention to my little helper playing by the toilet :)

Tuesday, July 15, 2014

The Project

My husband and I are raising our small children in our small - I like to say humble - home. The place is a two-bedroom, split-level townhouse built in 1983. It's been a blank canvas. Over the years we've worked to make it a home. I've scrubbed every floor, every wall and every cabinet in this place. But cleaning can only do so much. Three babies and many gallons of paint later, it's a home - no doubt. This place is our kids' first Home. So, being the fiercely loyal lady that I am, you don't get to say anything bad about it.  But I do, and the place needs some attention.

So let me establish this up front - I'm not a carpenter.  I'm a lawyer.  However, I've been influenced by, inspired and raised by a carpenter.  I am a carpenter's daughter. For those of you who didn't grow up as the only daughter of  self-employed builder, let me tell you this - it makes you strong, self-reliant and resourceful. And I wouldn't want it any other way.

Over these last 5 years as homeowners, my husband and I have learned a bit about what it means to maintain a house.  We're on a tight budget (you know, cos of the law school loans and the three small children), so being resourceful helps. And we've been pretty methodical about little updates here and there ~ dry wall and doors hung downstairs (by my carpenter dad); master closet designed and installed by my husband; nearly every wall painted; light fixtures replaced; and a hundred other little things.

But now it's time to do the bathrooms.  So, with an eye toward re-sale, I have a plan in mind for each: calm and cottagey upstairs; and sleek and modern downstairs.  After the bathrooms, maybe I'll do a few things to the kitchen, re-do another closet, and that'll be it - ready for market!

So this is the Project.  I'm excited to get started and anxious for you to follow along as I learn more about "remodeling," interior designing and prepping a house for market.  I hope you'll check in from time-to-time to follow my progress.  But don't check in too often, cos I can't promise to stick to a strict timeline.  It'll get done as I get it done.  Thanks for joining me!